AnaptysBio

Project size: 39,336 SF

Duration: 28 weeks

Customer: ANAPTYSBIO

Project Completed April 2021

The AnaptysBio TI project features a second-floor build-out over an existing and operating lab tenant on the first floor.  This buildout was finished only 14 weeks after the permit was issued, and the team worked closely with the tenant during the project to ensure all the goals were met.  The project was successfully completed in April 2021.

This project demonstrated C2 Building Group’s ability to deliver high-end finishes and meet the technical requirements of AnaptysBio.  The project was divided into 2/3 lab and 1/3 office at Bioscience Properties’ campus at 10770 Waterridge.  The scope included various new lab spaces with DI, compressed air, vacuum, N2, O2, and CO2 equipment and piping, as well as a cold room and all new mechanical and electrical equipment, including emergency power.