February 2019
$5.4M
C2 completed a 30,000SF lab and vivarium in Rancho Bernardo for Crown Bioscience. C2 led this 27 week (construction duration), design-build project which features all new mechanical systems to meet specialized pressurization and isolation requirements. All new electrical systems including tie-in to back-up generator and all new plumbing systems were installed. A mixture of repurposed and new lab casework and specialties were installed, refurbished fume hoods were installed, two new air showers were installed, all new bathrooms with showers, and office area with breakroom and feature conference rooms were also built. This project was designed, permitted, and built on time and on budget.